Tredwell Logo

Our Products

Completion Overshot

Our Completion Overshot represents a significant technological advancement for the company. This innovative equipment features a breakthrough design capable of swallowing and securing existing in-hole “old” tubing, specifically tubing stump. To enhance operational efficiency and adaptability, the Completion Overshot is optionally available withvarious bottom guide, self-alignment and wiper ring features. These additional functionalities further optimize performance in diverse well conditions. The Completion Overshot can incorporated advanced seal technology to ensures reliable pressure containment that follow body connection up to 5,000 psi, effectively mitigating the risk of leaks and maintaining well integrity.

Product Documents

Category:
Tredwell Logo
Delivering cutting-edge engineering services and technical expertise to drive your projects forward with precision and efficiency.
Main office Binjai photo 1
Main office Binjai photo 3
Main office Binjai photo 2

Headquarter Office
Kuala Lumpur, Malaysia

No 28-06 Binjai 8 Premium SOHO, 2, Lorong Binjai 50450, W.P. Kuala Lumpur, Malaysia
labuan-1
labuan-2
labuan-3
labuan-4

East Malaysia Operation - W.P Labuan

Ground Floor Of Lot 61, O&G Sec
Lazenda Warehouse, Jalan Rancha
Rancha, 87000 W.P Labuan, Malaysia
Warehouse Kemaman photo 1

West Malaysia Operation - Kemaman, Terengganu

Lot 874, Open Yard, Phase 2 Kemaman Supply Base, 24007 Kemaman, Terengganu Darul Iman, Malaysia
RAZEN Warehouse photo 3
RAZEN-Warehouse-photo-1
RAZEN Warehouse photo 2-min

Malaysia R&D Manufacturing Center - RAZEN

Serenia 1, No.27, Sepang, Selangor, 43900, Malaysia
support@tredwell.com.my
+603-2181-0337
© 2025 Tredwell. All rights reserved.